Accredited metering work

Smart meter installation in Sydney

Meter changes are accredited work. We do the physical install, the switchboard side and the network notification, without you chasing three different parties.

Burning smell, sparking switchboard or no power?

Do not touch it. Call us — 24 hours, every day.

Call 0434 757 074 now
Overview

Smart meter installs done once, done properly.

A meter change usually turns up as a condition of something else — a solar connection, a move to time-of-use pricing, an old accumulation meter that has reached end of life, or a retailer telling you a digital meter is required before they can proceed.

Whichever it is, the work has to be done by an accredited service provider and recorded with the network. We handle the meter, the space it goes into, and the notification, so the job does not stall halfway between your retailer and your distributor.

Accreditation

Level 2 ASP

Supply types

Single & three phase

Typical duration

Half a day

Networks

Ausgrid & Endeavour Energy

What is included

Everything in the price, listed.

Meter panel assessment

Whether your existing panel has the room, the earthing and the condition to take a new meter.

Single and three phase

Domestic and small commercial installations on both networks.

Meter replacement

Removal of old accumulation and clock meters, new digital meter installed and sealed.

Solar-ready metering

Metering configured for export where solar is being connected.

Switchboard remedial work

Where the panel needs repair or replacement before a meter can legally go on it.

Network notification

The paperwork lodged so your retailer can read the meter and bill correctly.

Before you book

When a meter change comes up

  • Your retailer has asked for a digital meter before switching plans
  • Solar is going on and export metering is needed
  • An old spinning-disc or clock meter has failed
  • You are moving from single to three phase supply
  • A new dwelling, granny flat or unit needs its own meter
  • The meter panel itself is damaged, unsafe or full
Detail

Where the delays usually happen

Most meter jobs that drag on do so for one reason: the panel is not fit to take the new meter, and nobody found out until the installer was on site. Old fibro panels, undersized mains, missing main switches and corroded earths all stop the job.

We check that first. If remedial work is needed you hear it at quoting stage with a price attached, not on the morning of the install.

  • Panel, mains and earthing inspected before any date is booked
  • Any remedial switchboard work quoted up front
  • Supply isolated, old meter removed, new meter fitted and sealed
  • Installation tested and left energised the same visit
  • Network notified so billing picks up the new meter

24/7

Emergency callout

2

Networks accredited

$0

To quote your job

401213C

NSW licence

How a job runs

Four steps, no mystery.

You call or send the form

Tell us what's happening. If it's dangerous we tell you what to switch off.

We quote it in writing

Fixed price where we can, hourly where the fault is unknown.

We do the work

On the agreed day. Anything that changes the price gets your approval first.

You get the paperwork

Certificate of Compliance, plus any network notification we lodged.

Straight answers

Smart meter installs questions we get asked.

Can any electrician change my meter?

No. Metering work is restricted to accredited service providers. A general electrician cannot legally break the network seal.

Do I arrange it with my retailer or with you?

It depends on why the meter is changing. Call us with what your retailer has told you and we will tell you which path applies to your situation.

How long is the power off?

Usually a couple of hours for a straightforward swap. Longer if the panel needs work first.

Will I need three phase?

Only if your load calls for it — ducted air conditioning, a large EV charger, workshop equipment or a bigger solar inverter. We can assess what your place actually draws.

Can you do units and strata?

Yes, including meter panels in common property. Strata approval may be needed before we start.

Get a written quote before anything starts.

Free quotes, 24/7 emergency, and a real person on the phone.