Solar panel installation done once, done properly.
A solar system is a roof job and an electrical job in equal measure, and the electrical half is where installs commonly come unstuck — a switchboard with no room for the solar breaker, consumer mains too small for the inverter, or metering that has to change before export can be switched on.
Because we are an accredited Level 2 ASP, all of that sits with us. We size the system against what your roof can carry and what your board can support, then connect it and get the export side sorted.
Scope
Roof to grid, one team
Typical duration
1–2 days
Paperwork
Compliance certificate
Networks
Ausgrid & Endeavour Energy
Everything in the price, listed.
Site and roof assessment
Orientation, shading, roof type and available area, measured rather than guessed.
System sizing
Matched to your actual consumption pattern, not just the biggest array that fits.
Panel and inverter supply
Quality tier equipment with manufacturer warranties, quoted by make and model.
Mounting and DC work
Rails, flashings and DC cabling installed to the roof type you have.
Switchboard and AC side
Solar breaker, isolators, labelling and any board upgrade the install requires.
Grid connection
Network application, metering configuration and commissioning for export.
Worth knowing before you sign anything
- A quote with no make and model on the panels or inverter is not a quote
- System size should follow your usage, not the roof area alone
- Shading from one tree or chimney can cost more than it looks
- An old switchboard may need upgrading first — it should be in the price
- Export limits differ by network and by street
- Rebate eligibility depends on accredited design and install
How a solar job runs
We look at twelve months of your bills before recommending a size. A system built around what you actually use during daylight hours will always beat a larger one exporting cheaply into the grid.
Install is typically one to two days on a standard home. The system is commissioned, tested and explained before we leave — including how to read it and what a normal day should look like.
- Consumption reviewed and system sized
- Network application lodged for connection approval
- Mounting, panels, DC cabling and inverter installed
- Switchboard work, isolators and labelling completed
- Commissioning, testing, metering and handover
24/7
Emergency callout
2
Networks accredited
$0
To quote your job
401213C
NSW licence
Four steps, no mystery.
You call or send the form
Tell us what's happening. If it's dangerous we tell you what to switch off.
We quote it in writing
Fixed price where we can, hourly where the fault is unknown.
We do the work
On the agreed day. Anything that changes the price gets your approval first.
You get the paperwork
Certificate of Compliance, plus any network notification we lodged.
Solar panel installation questions we get asked.
What size system should I get?
It follows your daytime usage, roof space and budget. We work from your bills rather than a rule of thumb.
Do you handle the rebate paperwork?
Federal small-scale certificates are claimed through an accredited install. Confirm current eligibility with us when you get a quote, as the scheme changes over time.
Will my switchboard need upgrading?
Sometimes. Older boards often lack space or RCD protection. We check at quoting stage so it is not a surprise later.
Can I add a battery later?
Yes, if the system is designed for it. Tell us at quoting stage and we will pick an inverter that leaves that door open.
How long until it is exporting?
Panels go on in a day or two. Export starts once the network and your retailer complete their side, which is usually the longer part.