Home & workplace charging

EV charger installation in Sydney

Home and workplace chargers, including the switchboard and supply work most installers have to hand to someone else.

Burning smell, sparking switchboard or no power?

Do not touch it. Call us — 24 hours, every day.

Call 0434 757 074 now
Overview

EV charger installation done once, done properly.

Charging from a standard power point works, slowly, and it was never designed to run at near capacity for eight hours at a stretch. A dedicated charger on its own circuit is faster and, more to the point, safer.

The install itself is straightforward. What varies is everything behind it: whether the switchboard has room, whether the consumer mains can carry another substantial load, and whether the house needs load management to avoid tripping the main switch when the car and the oven run together.

Types

Single & three phase

Typical duration

Half to one day

Includes

Dedicated circuit

Networks

Ausgrid & Endeavour Energy

What is included

Everything in the price, listed.

Supply assessment

What your mains and switchboard can actually carry before anything is ordered.

Charger supply and install

Wall or pedestal mounted, single or three phase units.

Dedicated circuit

New cabling run from the board, correctly sized for the charger and the distance.

Protection

RCD type and breaker rating to suit the charger manufacturer's requirements.

Load management

Where supply is tight, dynamic load control so the charger backs off instead of tripping the main.

Mains upgrade

Handled in house as accredited work where the existing supply is not enough.

Before you book

What decides the cost

  • Distance from the switchboard to where the car parks
  • Whether the cable run is accessible or has to be chased and made good
  • Single phase 7kW versus three phase 11kW or 22kW
  • Spare capacity in the switchboard
  • Whether the consumer mains need upgrading
  • Strata approval, for units and townhouses
Detail

Units, townhouses and strata

Charging in a strata building is a different problem to charging in a house: the supply is shared, the parking space may not be near your meter, and the owners corporation has to approve the work.

We can assess what the building's supply will support and what metering arrangement makes sense, which is generally what the committee needs before it will approve anything.

  • Supply and switchboard capacity assessed
  • Charger and mounting position agreed
  • Circuit run, protected and terminated
  • Load management configured where required
  • Charger commissioned, tested and demonstrated

24/7

Emergency callout

2

Networks accredited

$0

To quote your job

401213C

NSW licence

How a job runs

Four steps, no mystery.

You call or send the form

Tell us what's happening. If it's dangerous we tell you what to switch off.

We quote it in writing

Fixed price where we can, hourly where the fault is unknown.

We do the work

On the agreed day. Anything that changes the price gets your approval first.

You get the paperwork

Certificate of Compliance, plus any network notification we lodged.

Straight answers

EV charger installation questions we get asked.

How fast will it charge?

A single phase 7kW charger adds roughly 40km of range an hour for most cars; three phase is faster again if your supply and car support it.

Can my house handle a charger?

Most can, some need load management, and a few need a mains upgrade. We assess it before quoting.

Do I need three phase?

Only if you want faster charging than 7kW and your vehicle can accept it. For overnight home charging, single phase is usually plenty.

Can you install in an apartment car space?

Often yes, but it needs owners corporation approval and a metering arrangement that bills the right person.

Does it need a special safety switch?

Yes. Chargers have specific RCD requirements, and using the wrong type is a common fault in cheap installs.

Get a written quote before anything starts.

Free quotes, 24/7 emergency, and a real person on the phone.